MeituOverload capacity standard of dry type transformerRealize the transformation of product structure

announcer:hp122HP117294921 release time:2024-01-25 19:41:40

the transformer shall be placed for 24h

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

Before no-load impulse closing, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Meitu.How to make up oil for oil immersed transformer?

Brief introduction of zero line of power transformer

.A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

The method and whole process of taking oil sample of power transformer are as follows:

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.


MeituOverload capacity standard of dry type transformerRealize the transformation of product structure



In specific daily life, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

The proper selection of Anhui dry-type transformer has a key effect on improving the safety and smooth operation of power system software. In the above original text, we have already mastered the structure and characteristics of dry-type transformer. In this part,MeituPrice of box transformer 1600, we will describe how to select dry-type transformer according to the load characteristics and application environment of dry-type transformer.

Operation of oil immersed transformer

details.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

Power transformer manufacturer


MeituOverload capacity standard of dry type transformerRealize the transformation of product structure



High voltage fuse of transformer breaks one phase;

Workshop cost.Fault judgment of power transformer

Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.

The raw materials of Fushi blue can be used for bonding,MeituPicture of dry-type transformer grounding wire, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

Meitu.Equipped with a temperature controller,MeituOil immersed amorphous alloy transformer, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

What is the important role of power transformer