KokologoPower transformer specificationWhat problems should be paid attention to during operation

announcer:hp122HP117294921 release time:2024-01-21 13:40:24

Oil leakage of heat pipe radiator

What about oil immersed transformer fire?

Kokologo.Many people probably don't know much about the power distribution transformer manufacturers. In fact,KokologoPrice of recycled dry-type transformer, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.

When the full load test is carried out and everything is normal, the load can be connected.

.35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters,KokologoHow much is a 250kVA box transformer, so as to promote the safety of dry-type transformer!

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date, sampling person, weather conditions and other materials of the oil sample.


KokologoPower transformer specificationWhat problems should be paid attention to during operation



Before and after sampling,KokologoPower transformer, clean the periphery of the sampling port with clean or hairless linen.

The domestic transformer market is slow

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

How much does it cost?.In specific daily life, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

Power transformer manufacturer

Seal oil leakage


KokologoPower transformer specificationWhat problems should be paid attention to during operation



Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Latest quotation.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.

The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.

Oil leakage of bolt or pipe external thread

Kokologo.Seal oil leakage

Power transformer plant

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.