PingluAutomobile boarding bridge manufacturerDemand is shrinking rapidly

announcer:hp161HP196399230 release time:2024-07-15 12:40:37

These are the options for hydraulic oil for mobile boarding bridges.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, and foot of the slope, especially for the simple boarding bridge.

Pinglu.Features: Utilizing a sleeve type drag chain structure to achieve high-altitude operation with telescopic arms, the platform vehicle can achieve 360° Rotating, both the work platform and the platform truck can be operated. The work platform truck can safely walk with the boom in any position, and the walking speed decreases with the rise of the lifting height.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

.Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!

When working in foundation pits or depths, a helmet must be worn.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.


PingluAutomobile boarding bridge manufacturerDemand is shrinking rapidly



Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation no overbreak&rquote; The principle of.

(3) The steel wire rope in the elevator should be regularly checked for loose strands and broken wires, as it is frequently used and is also an important component. Therefore, there should be no careless inspection to avoid affecting the normal use of the elevator.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Meticulous workmanship.  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.


PingluAutomobile boarding bridge manufacturerDemand is shrinking rapidly



Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.

Sales Department.The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency and achieve greater economic benefits for enterprises.

The product has a sturdy structure, a large load-bearing capacity, smooth lifting simple and convenient installation and maintenance, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The editor will share with you some common knowledge about daily maintenance of outdoor elevators: When personnel enter the interior of the lifting platform for maintenance, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

Monthly maintenance of hydraulic boarding bridges: check for wear on rollers,PingluMaintenance of boarding bridge,PingluManufacturing of boarding bridges, intermediate shafts and bearings, cylinder pins and bearings, boom hinge shafts and bearings,PingluContainer boarding bridge, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.

Pinglu.These are the options for hydraulic oil for mobile boarding bridges.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

conduct.