Mexico CityFixed hydraulic boarding bridgeBasic requirements for homework

announcer:hp161HP196399230 release time:2024-05-29 10:28:54

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Mexico City.When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform,Mexico CityFixed hydraulic boarding bridge, and there is basically no change to the building structure.

.These are the options for hydraulic oil for mobile boarding bridges.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work,Mexico CityVehicle mounted boarding bridge, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).


Mexico CityFixed hydraulic boarding bridgeBasic requirements for homework



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Advantages: Widely used high-altitude work equipment, stable and safe, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons 11200m for 8 tons, close attention should be paid to the condition of the equipment and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

device management.During use, and if there are any problems,Mexico CityMobile cllimbing, the use should be stopped immediately.

The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.

Slowly reverse and park the container under the lip at the front of the boarding bridge.


Mexico CityFixed hydraulic boarding bridgeBasic requirements for homework



The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Sincere service.Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Drain all the hydraulic oil in the oil tank, open the oil tank, take out the oil suction filter clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Mexico City.The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.

Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

Install drainage ditches on the ground near the pit of the simple boarding bridge, surface, especially for the simple boarding bridge.