Fort WorthProcurement of fixed boarding bridgesWhat are the steps for beauty care

announcer:hp161HP196399230 release time:2024-05-12 13:56:50

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

Fort Worth.The outstanding characteristics of air suspension are good smoothness, less maintenance, long service life, significant improvement in protection of cargo compared to steel plate suspension, and greatly reduced damage to the entire vehicle and road surface. The leaf spring produces different bending under different loads, so the distance between the whole vehicle and the ground is always changing. If the load is increased while keeping the spring unchanged, it will also reduce the natural frequency of the spring and even change the characteristics of the spring. The air spring is based on the compressibility of air. The air enclosed in the air bag is an element. Different air bag pressures of the air spring system balance different loads. When the height of the air bag is fixed, the distance between the car body and the road surface remains unchanged.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

.It is strictly prohibited to apply excessive pile loads around the foundation pit.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, pump stations, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, valve, and fixing device,Fort WorthBoarding axle hydraulic mobile type, and if the noise is caused by its vibration.


Fort WorthProcurement of fixed boarding bridgesWhat are the steps for beauty care



The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings. Professional axle manufacturers and other special products, 20 year old brand, with price advantages and guaranteed quality

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

safety requirements .As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Shake the handle to raise the boarding bridge to the height of the container.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.


Fort WorthProcurement of fixed boarding bridgesWhat are the steps for beauty care



To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on,Fort WorthWarehouse boarding bridge, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Installation materials.Portable hydraulic press boarding bridge: It is a widely used type, suitable for places where loading unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses,Fort WorthFixed hydraulic boarding bridge, etc

Application of hydraulic boarding bridges: Hydraulic boarding bridges can be widely used in docks, platforms, warehouses, etc. according to user needs. Special designs can be made in terms of external dimensions, load, etc. The fixed boarding bridge is installed on the side of the cargo platform, and its outer end can be higher or lower than the plane of the cargo platform, making it equal to the height of the carriage. There is a flip board at the top of the bridge, which automatically attaches to the edge of the carriage, ensuring a smooth passage between the cargo platform and the carriage.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Fort Worth.The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

It is strictly prohibited to apply excessive pile loads around the foundation pit.