NeustadtThe boarding bridgeStable performance

announcer:hp161HP196399230 release time:2024-05-06 13:31:51

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope especially for the simple boarding bridge.

During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making work safer and improving work efficiency.

Neustadt.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

Tighten the manual valve to close it.

.It is strictly prohibited to apply excessive pile loads around the foundation pit.

When replacing hydraulic oil sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.


NeustadtThe boarding bridgeStable performance



Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platform vehicles, lifting platform vehicles, and unloading platform vehicles: Anti slip device: This device is welded from steel plates, which can effectively achieve anti slip function and is reliable.

Open the manual valve, slowly lower the boarding bridge,NeustadtManufacturing of boarding bridges, and secure more than 90% of the lip plates at the bottom of the container.

Industry management.The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

During use,NeustadtManufacturing of boarding bridges, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!


NeustadtThe boarding bridgeStable performance



Slowly reverse and park the container under the lip at the front of the boarding bridge.

Installation material list.There is a flip plate at the top of the bridge deck,NeustadtFixed hydraulic boarding axle, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

Applicable scenarios: municipal road engineering inspection, street lamp maintenance, branch construction, etc.

Shake the handle to raise the boarding bridge to the height of the container.

Neustadt.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.