SalsalsalleFixed hydraulic boarding axleIntroduction and occasions of use

announcer:hp161HP196399230 release time:2024-05-03 11:24:41

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse,SalsalsalleManufacturing of boarding bridges, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

The length of the electric hydraulic boarding bridge is generally about 10 meters and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Salsalsalle.When the boarding axle is far away from the frame, the rod moves downward to open the air release valve, and the air in the air spring is atmospheric, and the body and frame then reduce to the original value. The dual or multi axle air suspension boarding axle can also be lifted on a single or multiple axle when unloaded or partially loaded, which can protect the raised tires. Simultaneously reducing incorrect guidance while reducing tire wear on other axles. In addition,SalsalsalleEmbedded boarding bridge, there are other positive effects during the driving process. On the one hand, it generates appropriate stable force when unloaded and partially loaded, and on the other hand, it improves the adhesion of the drive shaft.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

.Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.


SalsalsalleFixed hydraulic boarding axleIntroduction and occasions of use



Shake the handle to raise the boarding bridge to the height of the container.

In the economic field, the safety, punctuality, flexibility, and price to efficiency ratio of transportation are directly related to the fate and survival of enterprises due to different road conditions. Therefore, people have high expectations for commercial freight hydraulic boarding bridges, especially those that serve as the main components of trailers and semi trailers. Continuously developing, developing, and producing multiple series and varieties of hydraulic boarding bridges to meet the needs of modern cargo transportation. Below is an introduction to the characteristics of the hydraulic boarding bridge suspension system.

For slopes that are unstable or unstable after earthwork excavation,SalsalsalleElevated boarding bridge, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

The cost is reasonable.Open the manual valve, slowly lower the boarding bridge and secure more than 90% of the lip plates at the bottom of the container.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, indicator light on press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


SalsalsalleFixed hydraulic boarding axleIntroduction and occasions of use



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Word of mouth recommendation.Hydraulic boarding bridges should strictly adhere to the principle of being overweight, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms. Is the boarding bridge easy to use? The boarding bridge is an auxiliary equipment used to bridge with the freight car and is designed to solve the height difference between the freight car and the ground. Suitable for fixed or mobile loading and unloading of goods, it is actually equivalent to a slope, allowing forklifts to smoothly enter the carriage to load and unload goods, requiring only one person to quickly load and unload goods, which is labor-saving.

Shake the handle to raise the boarding bridge to the height of the container.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.