ShijiazhuangMechanical fixed boarding bridgeAfter the holiday, the price of resuming blast furnace production remained stable and sorted out

announcer:hp161HP196399230 release time:2024-04-23 11:53:56

Install drainage ditches on the ground near the pit of the simple boarding bridge,ShijiazhuangHydraulic mobile boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

During the application process of hydraulic boarding bridges, and be careful when changing or refueling. Only use a cleaning funnel equipped with a fine mesh filter to pour oil from the container into the oil tank. Of course, the oil you use should be the type recommended by the equipment manufacturer.

The hydraulic boarding bridge not only reduces labor intensity, but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

.To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.


ShijiazhuangMechanical fixed boarding bridgeAfter the holiday, the price of resuming blast furnace production remained stable and sorted out



Hydraulic boarding bridges should strictly adhere to the principle of being overweight as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

Drain all the hydraulic oil in the oil tank, open the oil tank,ShijiazhuangAxle Co., Ltd, take out the oil suction filter, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Application process.During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!

The pressure on the axle will reduce the service life of the boarding axle.


ShijiazhuangMechanical fixed boarding bridgeAfter the holiday, the price of resuming blast furnace production remained stable and sorted out



  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

Quality recommendation.Shake the handle to raise the boarding bridge to the height of the container.

Usage environment: Able to adapt to specific working environments, such as working in highly corrosive, dusty high-temperature, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Shijiazhuang.Tighten the manual valve to close it.

The correct operation of the hydraulic boarding bridge is good maintenance,ShijiazhuangBoarding bridge steel plate, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.