PotsdamMaintenance of boarding bridgeWith design application pilot

announcer:hp161HP196399230 release time:2024-03-16 09:44:04

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Potsdam.Outdoor elevators and factory cargo elevators are heavy lifting mechanical equipment. Outdoor elevators are used for transporting goods between floors of buildings, and are specialized hydraulic cargo elevator products. They are mainly used for transporting goods up and down between various working floors; Vertical garage and car lift between garage floors. The hydraulic system of the product is equipped with anti fall and overload protection devices, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point operation. Long term promotion of axle manufacturers' complete products, excellent quality, and discounted prices

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage,PotsdamDesign of mobile boarding bridge, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked,PotsdamContainer dedicated boarding bridge, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Tighten the manual valve to close it.


PotsdamMaintenance of boarding bridgeWith design application pilot



During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, as it is frequently used and is also an important component. Therefore, there should be no careless inspection to avoid affecting the normal use of the elevator.

What is a hydraulic boarding axle? The hydraulic boarding bridge is a special auxiliary equipment used for fast loading and unloading of goods, and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?

Good quality.What are the issues to pay attention to when using the boarding bridge? For example, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

Hydraulic boarding bridges should strictly adhere to the principle of being overweight as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

Open the manual valve, and secure more than 90% of the lip plates at the bottom of the container.


PotsdamMaintenance of boarding bridgeWith design application pilot



During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

Potential development.Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used but now there are both manual and electric boarding bridges that are more convenient to use.

The mobile boarding bridge is a type of forklift that directly loads and unloads goods from the ground to the truck

When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

Potsdam.When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found