Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Huanghua.High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform and there is basically no change to the building structure.

During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?


HuanghuaContainer boarding bridgePrecautions for installation and operation



There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders,HuanghuaHydraulic boarding bridge mobile type, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge,HuanghuaLifting and disembarking bridge, motor, valve and fixing device, and if the noise is caused by its vibration.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use. Long term promotion of various brand products such as axle manufacturers, with complete designated products and guaranteed quality

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.


HuanghuaContainer boarding bridgePrecautions for installation and operation



Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

Process inspection.Open planning before placement makes it easy to clean up clutter.

The above content mainly shares the importance analysis of regular maintenance of mobile boarding bridges with everyone, hoping that everyone can take it seriously and not overlook it.

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned,HuanghuaEmbedded boarding bridge, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

Huanghua.When it comes to fixed hydraulic boarding bridges, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.