LeshnoFixed hydraulic boarding bridgeControl issues to consider

announcer:hp161HP196399230 release time:2024-02-12 12:30:20

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Check if the manual valve is open. When using, which uses manual hydraulic lifting otherwise the boarding bridge may be damaged.

Leshno.Applicable scenario: Suitable for mobile high-altitude operations such as setting and inspection of high-altitude equipment in various industries.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, but now there are both manual and electric boarding bridges that are more convenient to use.

.Check if the manual valve is open. When using, it must be opened otherwise the boarding bridge may be damaged.

Tighten the manual valve to close it.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.


LeshnoFixed hydraulic boarding bridgeControl issues to consider



What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains cover the boarding bridge with a rain cloth to prevent rusting and aging.

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.

When working in foundation pits or depths, a helmet must be worn.

Direct labor.There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, valve, and fixing device, and if the noise is caused by its vibration.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, I will take you to understand!

Job description.The pressure on the axle will reduce the service life of the boarding axle.

Features: Adopting a foldable arm (two section arm, three section arm), with a working height of 15-45 meters,LeshnoProduction of boarding bridges,LeshnoMobile cllimbing, and the lifting arm can rotate 360 degrees;, Both the turntable and the work platform can be operated. The work platform can safely walk with the boom in any position, and the walking speed decreases with the rise of the lifting height. Set up the upper and lower platforms (ground platform and platform vehicle platform), and use directional switches to switch between the upper and lower platforms.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Leshno.Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.