EggerElectric lifting platform Hydraulic lifting platformOrderly advance

announcer:hp530HP141750488 release time:2024-09-17 09:16:04

The classification of lifting platforms is as follows: they are divided into mobile lifting platforms, automatic lifting platforms, hydraulic lifting platforms, folding arm lifting platforms, and sleeve type lifting platforms according to their different modes of movement.

Regularly check whether each organization is functioning properly and whether there is noise. If problems are found, they should be promptly cleaned up.

Egger.In case of strong wind of level 6 or above, rainstorm, thunder, fog and other bad weather, the work at heights in the open air shall be stopped at the boarding bridge.

After 5000 hours of elevator operation, carry out medium maintenance on the mechanical and electrical systems.

.The hydraulic elevator overflow valve can also generate high noise. When air is mixed in hydraulic oil, the overflow valve is stuck or severely worn, the spring of the overflow valve is fatigued and deformed, resulting in unstable pressure regulation of the overflow valve, and the relief time of the overflow valve is too short, it is easy to cause the pilot valve performance of the overflow valve to be partially stable, causing air to vibrate inside the pilot valve and generate noise. So we need to regularly clean the overflow valve. When the overflow valve is damaged or severely worn, it should be replaced.

The classification of lifting platforms is as follows: they are divided into mobile lifting platforms, automatic lifting platforms, hydraulic lifting platforms,EggerMobile hydraulic lifting platform, folding arm lifting platforms, and sleeve type lifting platforms according to their different modes of movement.

After 1500 hours of elevator operation, and the workbench is evenly loaded to 125% of the maximum load capacity. After lifting 100 times, each load-bearing component must not have deformation or cracks.

This product has a solid structure, high load-bearing capacity, smooth lifting, easy installation and maintenance, and is an ideal cargo transportation equipment for replacing elevators on lower floors.

After the pre installation is completed the pre installed equipment should be fixed,EggerManual pressure relief of hydraulic lifting platform, and the positions of cables, oil pipes and components such as the pre installed frame should be confirmed to be correct before reinforcement work can be carried out. Reinforcement requires welding or screws, and the hydraulic cargo elevator after reinforcement has robustness and safety.

management.Volume speed control circuit: Speed control is achieved by adjusting the displacement of a variable pump or variable motor.

To consider its capacity, and fixed equipment takes 3-4 times.

The characteristics of the platform include reliable hydraulic system, simple operation, large load-bearing capacity,EggerProduction hydraulic lifting platform, and rear hinge support.


EggerElectric lifting platform Hydraulic lifting platformOrderly advance



The contact of the travel switch must be firmly opened and closed, the hydraulic pump runs at high speed. If there is a problem with the gears or bearings of the hydraulic pump, which causes periodic changes in the hydraulic system pressure, it will also cause resonance in the hydraulic system and generate noise.

The machine room can be located within a radius of 15 meters of the shaft, occupying only 3-4 square meters. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

Users should arrange dedicated personnel to operate hydraulic elevators formulate usage details and safety precautions for hydraulic elevators based on their own situation, and hang them on the

Egger.Stable and widely applicable cargo lifting equipment is mainly used for transporting goods between height differences in production lines; Material online and offline; Adjust the height of the workpiece during assembly; High altitude feeder feeding; Lifting of components during assembly of large equipment; Large machine material and cutting; The warehouse loading and unloading site is equipped with forklift and other transportation vehicles for rapid loading and unloading of goods.

Volume speed control circuit: Speed control is achieved by adjusting the displacement of a variable pump or variable motor.

For hydraulic cylinders in hydraulic elevators, it is not practical to change their effective working area A (equivalent to displacement) to adjust the speed. Generally, the speed can only be adjusted by changing the flow rate. For variable displacement motors, speed regulation can change both the flow rate and the motor displacement.