El PragueGuide rail hydraulic lifting platformCommon problems and solutions

announcer:hp530HP141750488 release time:2024-06-11 15:12:54

The installation personnel should confirm and count the equipment details, confirm that there are no omissions in the shipped equipment details, check if the tools are complete, and ensure the smooth progress of the installation process.

To consider its capacity, generally mobile equipment takes 2-3 times the high flow rate of pump Z, and fixed equipment takes 3-4 times.

El Prague.Cleaning and maintenance: When there is oil in the oil tank or when oil is refilled, it is necessary to ensure the cleanliness of the filter tank cover. Clean the oil and funnel or container before use. Never bring dirty things into the system, only clean oil.

There are many reasons for unstable workbench descent, such as overload, hydraulic oil impurities, etc. In response to the above reasons, it can be solved by reducing the load, adjusting the center of gravity of the load, and replacing hydraulic oil wholesale for hydraulic cargo elevators.

.The guide rail type elevator has a structure of a straight top oil cylinder. The linear operation of the oil cylinder pulls the transmission chain, driving the lifting of the table to complete the operation. The guide rail type elevator is a popular form of cargo elevator in recent years, stable operation, and simple maintenance compared to the scissor fork type elevator.

Vehicle mounted lifting platform is widely used for high-altitude operations in hotels, buildings, airports,El PragueHydraulic mobile lifting platform, stations, sports venues, workshops,El PragueHydraulic lifting table, warehouses, and other places; It can also be used as temporary high-altitude lighting, advertising, etc.

When the hydraulic lifting platform is working, the load cannot exceed its rated load. When it is raised to a certain height the larger the mass of the object, the greater the shaking


El PragueGuide rail hydraulic lifting platformCommon problems and solutions



The development of elevators is at its peak, as many manufacturers have chosen more multi-story buildings to fully utilize the site, so they also need a device to facilitate the improvement of goods.

Any work carried out at a height of 2 meters or above should be considered as work at height. Any work that can be done in advance on the ground must be done on the ground to minimize high-altitude operations.

Load bearing capacity: The lifting platform is placed on a horizontal support surface, and the workbench is evenly loaded to 125% of the maximum load capacity. After lifting 100 times, each load-bearing component must not have deformation or cracks.

Quality inspection report.The contact of the travel switch must be firmly opened and closed and the contact crater should be polished in a timely manner.

For hydraulic cylinders in hydraulic elevators, it is not practical to change their effective working area A (equivalent to displacement) to adjust the speed. Generally, the speed can only be adjusted by changing the flow rate. For variable displacement motors, speed regulation can change both the flow rate and the motor displacement.

When installing disassembling, and adjusting the rotating mechanism,El PragueStraight top hydraulic lifting platform, attention should be paid to ensuring that the middle line is parallel to the middle line of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable for the brakes of each mechanism. The clearance between the brake wheels should be regularly checked and adjusted to ensure its flexibility and reliability. There must be no dirt on the friction surface and it must be cleaned with gasoline or diluent.


El PragueGuide rail hydraulic lifting platformCommon problems and solutions



The above are the working principles of three common elevators, and there are also some forms of elevators that are not common, such as cylinder mounted elevators, curved arm elevators, car mounted elevators, etc. Their common feature is the hydraulic principle for operation, because the stability of the hydraulic system can bring better user experience and safer operation to the equipment, which has been favored by many users.

Discount.Reason: The lowering valve is not tightly closed. Cleaning method: Check if the lowering valve is powered on. If there is no power supply, clear the malfunction of the lowering valve itself or replace the lowering valve. It is necessary to keep the valve of the lowering valve clean and flexible.

The load of goods and the tonnage of goods transported at once also affect the lifting speed. The optimal value for transporting goods on a lifting platform is speed. If it is too heavy, it will affect the speed.

The cylinder head oil seal is too tight or the rod is bent, which can also cause noise during movement due to other forces. At this point, the oil seal or straightening rod must be replaced in a timely manner.

El Prague.Stable and widely applicable cargo lifting equipment is mainly used for transporting goods between height differences in production lines; Material online and offline; Adjust the height of the workpiece during assembly; High altitude feeder feeding; Lifting of components during assembly of large equipment; Large machine material and cutting; The warehouse loading and unloading site is equipped with forklift and other transportation vehicles for rapid loading and unloading of goods.

Oil leakage is a common malfunction. Due to loose joints or damaged sealing rings, oil leakage may occur. Therefore, this fault can be solved by tightening the oil leakage joint or replacing the damaged sealing ring.

The undercut length of the weld mm should not exceed 10% of the weld seam, and the depth should not exceed 0.4mm.